The Right Order of a Remodel
The order of a US remodel: survey, design and permits, demolition, rough-in, windows, insulation, finishes, then cabinets, fixtures and lighting last.
We build to the drawing: we read the design and price it first, then go to site. In the Seattle area and in Ukraine.
LINKS Construction Group is the construction arm of DeZZign, an architecture and interior studio. We build to DeZZign designs, to your design or to our own.
We price the job before work starts, source the materials and equipment, and the author of the design follows the build from the foundation to handover. In Washington State the work on site is done by registered contractors we have built with; in Ukraine, by crews we have worked with or checked ourselves.
Residence 11: a turnkey penthouse
Copper Hall: an office in a copper skin
Trichology Institute: display and entrance
An apartment renovation in a panel block
A kitchen with quartz and an island
A kitchen with a farmhouse sink
A pine-clad attic room
A floor-to-ceiling library wall
A composite deck
Framing and insulation in a remodel
The order of a US remodel: survey, design and permits, demolition, rough-in, windows, insulation, finishes, then cabinets, fixtures and lighting last.
We use necessary cookies to make the site work and, with your consent, Google Analytics to see which pages people read. Learn more