Projects · Residential
Framing and insulation in a remodel
- Date2025
- LocationEastside: Kirkland, Bellevue, Redmond, Washington
What ends up behind the walls: new partitions, openings, floor and wall insulation, drywall. Two houses on the Eastside, Washington.
Most of a US remodel is not kitchens but walls: framing, insulation, drywall, mud and paint. It looks ordinary in photos, yet this is where a house becomes warm, quiet and straight. Everything that gets closed in, we photograph before it disappears.
What we did
- new wood-framed partitions
- a kitchen re-layout with the ceiling opened up
- rigid foam boards in the floor
- a new opening in an exterior wall with a header
- kraft-faced batts in the walls
- drywall, corner bead and mud for paint
The kitchen in one of these houses: A kitchen with a farmhouse sink. Why hidden work is recorded before it is covered: on our blog.
Photos from the site














