UKR RUS ENG

Services

Procurement

We source and deliver the materials and equipment the design calls for, natural ones wherever we can. A purchase log shows the price, delivery date and status of every item, so you always see what is bought, what is on the way and what is waiting for its stage. The project on site looks the way it does on the drawing.

Supervision:
our engineer and the design author
Cost:
by estimate

What it is and when you need it

Procurement means that everything the design calls for arrives on site on time and exactly as specified. The tile in the same tone, the faucet from the same series, the light fitting with the same colour temperature. When every trade buys its own materials, a design slowly turns into a list of substitutions. Procurement is there so that does not happen.

We use natural materials wherever we can and wherever the design allows. It is part of how we build.

What is included

  1. finishing materials per the design
  2. equipment for the building services
  3. plumbing fixtures
  4. furniture and lighting
  5. finding reliable suppliers, tenders and purchase support
  6. a purchase schedule tied to the stages of work
  7. visits to suppliers with you when a material needs to be seen in person

How the work goes

  1. The specification

    We take every item from the design: product code, size, colour, quantity. Where the design leaves something open, we settle it with the author of the design and with you.

  2. Suppliers

    We collect quotes and compare price, lead time and terms. Large items go to tender.

  3. The schedule

    Purchases are set into the construction schedule. Equipment for the building services is on site before the installers arrive, tile before finishing starts. Nothing sits on the lot for months, and nothing keeps a crew waiting. In the Seattle rain that also means materials are not left out to soak.

  4. Receiving

    Every delivery is checked against the specification, for quantity and for condition. Damaged or wrong items go back to the supplier; they are not installed.

What you get

A purchase register with every item, its price, delivery date and status, coordinated with the contractors on site, who in Washington State are registered with L&I. And a project that looks on site the way it looks on the drawing.

How it is priced

Procurement is part of turnkey construction, and it also works on its own: with construction to the design, or with estimates and costing when you already know what to buy. In the US the fee is set in the estimate for your project.

In Ukraine

In Ukraine procurement starts from 5% of the estimate, and our partner discounts run from 10 to 40% depending on the item.

Where we have done it

Sites where we did this kind of work.

Further reading

Contact us to discuss your project!