Design supervision
We make sure what is built matches the design at every stage. Every visit ends with written notes, drawing sheets are updated where the site called for changes, and the author of the design takes part in the final check before the handover is signed. From $2,000/month in the Seattle area, from $15/m² in Ukraine.
- Supervision:
- the author of the design
- Cost:
- from $2,000/month in the US
- Timelinethroughout the build
- Costfrom $2,000/month in the US
- Supervisionthe author of the design
What it is and when you need it
Between a drawing and a house there are hundreds of decisions made on site. A crew moves an opening because it is easier. A supplier delivers a different tile. A contractor simplifies a detail. Each one looks small on its own; together they give you a house that resembles the design only from a distance.
Design supervision keeps what is built matching the design at every stage. It is led by the author of the design: the person who knows why every line on the drawing is there, and what can change without hurting the idea and what cannot.
What is included
- site visits up to twice a week
- help choosing contractors
- consultation for you and for the crews
- meetings with you and the contractors up to three times a week
- adjustments to the construction drawings when the site requires them
- quality control of the work
How the work goes
Start
The author of the design walks the contractors through the drawings and helps you choose who will build. We work only with qualified contractors: if a crew does not read the drawing, no amount of supervision will save the house. In Washington State that means contractors registered with L&I, with general liability insurance.
Site visits
At each stage the author checks that what is built matches the drawings: dimensions, details, materials. The most important things are seen before they are covered: framing, hidden work, the routing of the building services. In the Pacific Northwest that includes the details that keep the rain out.
Decisions
When the site turns up something the design did not foresee, the author adjusts the construction drawings, and the crew builds from the revised sheet, not from a word on site.
Meetings
Regular meetings with you and the contractors, where questions are settled before they turn into rework.
What you get
A house that matches its design. Notes from every visit, revised sheets wherever the site required a change, and the author at the final walk-through before acceptance is signed.
Cost
from $2,000/month in the US
In the Seattle area design supervision starts from $2,000 a month. It is part of turnkey construction together with full procurement, and it also works on its own when another contractor builds.
In Ukraine
In Ukraine design supervision starts from $15/m², with the same visits, meetings and checks.
Where we have done it
Sites where we did this kind of work.
Further reading
-
Construction
Why We Build From the Drawings
Schematic design shows what a house will look like. Construction documents show how to build it, what it really costs and who answers for the result. -
Construction
Hidden Work: Record It Before Cover
Rebar, waterproofing, insulation, pipes and wiring disappear behind concrete and drywall. What to record, and how, while you can still see it. -
Construction
The Right Order of a Remodel
The order of a US remodel: survey, design and permits, demolition, rough-in, windows, insulation, finishes, then cabinets, fixtures and lighting last.